Rally preparations

There is some work going on in the garage. In a weeks time the Rallycooper will roll down to France for the annual November Sun Run, http://www.15-50ac.org.

But before takeoff there are some things to fix…

We,  me and my team member/navigator/mechanic Joel (www.minilimo.se), have done some work already: oil change,  alternator, clutch release bearing, brake check, shock absorbers, wheel setup and suspension, reverse light,  windscreen washer and jets, raising the hi-lo suspension kit so 12 inch unstudded winter tyres on Rover rims could be mounted, sort out spares and tools,change seats, equip with torches, and more.

Test drive and change of door numberplates is next on the schedule.